EasyManuals Logo

Bruker InsightMR User Manual

Bruker InsightMR
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
Operation
40 H155936_3_003
Fix the insulated transfer line to the top of the magnet using the transfer line holder or
Velcro tape.
Figure7.2: Mounting the Insulated Transfer Line
Switch the pump on.
Check that the solvent returns to the vessel and that the total volume remains stable.
Check that the liquid level in the thermostat remains stable.
Start the process to monitor (e.g. by adding the last reagent to the reaction mixture).
7.2 Acquiring NMR Data Using InsightMR Software
Upon installation of InsightMR, launch the program by clicking on the InsightMR desktop
Icon.
Refer to the InsightMR quick start guide under Help - QuickStart for instructions on how to
use the software. Under Help there are also manuals for IconNMR and Dynamics Center, the
foundation platforms of InsightMR.
Additional information, a video and an educational webinar can be found at our webpage:
https://www.bruker.com/insightmr
NOTICE
Material damage to flow unit due to incorrect automation mode
Failure to set the Sample Changer/Automation mode to Flow Tube (InsightMR) may result
in flow tube breakage.
u Set the Sample Changer/Automation to Flow Tube (InsightMR) in IconNMR
configuration Automation/Master Switches.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Bruker InsightMR and is the answer not in the manual?

Bruker InsightMR Specifications

General IconGeneral
BrandBruker
ModelInsightMR
CategoryAnalytical Instruments
LanguageEnglish