2.1. Tools required
Step Tools required
Assembling the axle
Spirit level
Set of wrenches
Mallet
Mounting the motor and the
control panel
Small flat head screw driver
Cross-head screw driver
Stripping pliers
Cutting pliers
Stanley knife
Percussion drill and Ø 8 mm concrete drill bit
Assembling the pit wall
Rivet pliers
Mallet
Percussion drill
Measuring tape
Drill, 5 mm
Concrete drill bit, 13 mm
Allen key, no. 5
Cross-head screw driver, no. 2
Assembling the beam and
brackets
Wrenches
Allen keys
Wood cutting tools (wooden duckboarding)
2.2. People required
Step Number of people Length of time
Assembling the cover axle 2 1 hour
Installation of the motor drive system 1 1 hour
Installing the pit wall 2 1 hour
Assembling the slat cover apron
2
1 hour
Mounting the beam or brackets 2 1 hour
The lengths of time quoted do not take the time required to fill the pool into consideration, this will depend on
the flow rate of the water supply and the volume of the pool.