IMPORTANT NOTE
Li e unit into place using a fork li truck, or similar liing device, if liing e unit from
above spreader bars must be used to avoid any pressure on e sides of e unit or packing
materials.
DO NOT PUSH OR DRAG THE UNIT ALONG THE GROUND.
NOTE: These units are not recommended for plant room
installation.
1. Ensure heat pump on site is as ordered, i.e. model, electrical supply
and factory fitted options
2. Inspect unit for damage, in particular inspect e evaporator (finned
side) to ensure at it is undamaged. (Minor indentations in e fins
do not affect performance). If severely damaged, endorse delivery
note in presence of e driver and send a recorded delivery letter to
transport company giving details.
3. Protect unit if installation is delayed.
4. Provide a firm level base capable of supporting operational weight
of unit; spread load on timber floor.
5. Ensure water cannot collect under unit - recommend units are
installed on plin100mm above finished floor level and to also aid
condensate drainage.
6. Allow adequate clearance to service panels on unit; recommend
500mm minimum (see installation drawings).
7. All Calorex heat pumps are by design as quiet as is practical,
however due consideration should be given to siting in order to
fully exploit is feature, i.e. ensure at e inlet and outlet grilles
face away from occupied premises.
8. Ensure loose debris such as leaves, grass cuttings, etc will not block
air inlet filters or grilles.
9. Consider protection from extreme weaer conditions.
INSTALLATION
1. SITING
6
SD566250 ISSUE 35
PR0-PAC SYSTEM OWNER INSTALLATION MANUAL