EasyManua.ls Logo

CAME ATI KIT

CAME ATI KIT
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
END OF INSTALLATION
STAGE 2
BEFORE STARTING STAGE 3 -
Commissioning the Control Panel
PLEASE CHECK THAT YOU HAVE CORRECTLY:
Ref Page
1. GAINED ACCESS TO MOTORS 2.1 9
2. INSTALLED MOTORS 2.2 10
3. ADJUSTED OPEN/STOP LIMIT SWITCH 2.3 10
4. WIRED THE MOTORS 2.4 12
5. WIRED THE SAFETY PHOTOCELLS 2.5 13
6. INSERTING THE FREQUENCY CARD 2.6 13
7. WIRED THE TUNED ANTENNA 2.7 14
8. CODED THE REMOTE CONTROLS 2.8 14
9. POWERED UP THE CONTROL PANEL 2.9 14
NOW STAGE 2 IS FULLY COMPLETED YOU ARE READY TO
BEGIN STAGE 3 OF YOUR ATI AUTOMATION KIT
INSTALLATION
16

Related product manuals