p.
26 - Manual
FA00045-EN v.
2 - 09/2016 - © Came S.p.A. - The contents of this manual may be changed, at any time, and without notice.
Date Notes Signature
Fitter's stamp Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Job performed
___________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________
Extraordinary maintenance
⚠
The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by
specialized contractors.
N.B.: Any extraordinary maintenance jobs must be done only by specialized technicians.
Extraordinary maintenance log
a
MAINTENANCE
Periodic maintenance
☞ Before doing any maintenance, cut off the mains power supply, to prevent any hazardous situations
resulting from the door's unexpected movement.
Periodic maintenance log kept by users (every six months)
Fitter's stamp Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Job performed
___________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________