▲!The connections of Loadcell and indicator must be reliable, and the shielded cable of
Loadcell must be reliably grounded. Connections wires shall not be plugged and pulled when the
indicator is in a Power-up State in order to prevent static electricity damaging to the indicator or
Load cell.
▲!Since both Load cell and indicator are static-sensitive device, anti-static measures must be
practically taken in the use, and welding or other strong-electric operations on weighing platform are
strictly prohibited. In the thunderstorm season, reliable lightning protection measures must be taken to
prevent lightning damaging the senor and instrument and to ensure the operator safety and the safe
operation of weighing equipment and related equipment.