EasyManua.ls Logo

Cascade TEK TFO-1 - Installation Procedures; Installation Procedure Checklist

Cascade TEK TFO-1
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13 | Page
INSTALLATION
INSTALLATION PROCEDURE CHECKLIST
For installing the unit in a new workspace location.
Pre-Installation
Check that the required workspace ambient conditions for the oven are met, page 14.
Unit dimensions may be found on page 43
Check that the required ventilation and spacing requirements are met, page 14.
Check that a suitable electrical outlet and power supply is present, page 15
Installing the oven
Review the lifting and handling instructions, page 16
Install the oven in its workspace location, page 16
Make sure the oven is level, page 16
Set up the oven for use
Clean the oven chamber and shelving if needed, page 16
Install the shelving in the oven chamber, page 17
Verify that the stopper is installed in the access port on the outside of the oven, page 17

Other manuals for Cascade TEK TFO-1