230 Series Auger Packer
44 OF 115
FEED SYSTEM ASSEMBLY
AUGER
Check that the auger is centered in the spout. (See chapter on how to center filling spout)
Check that the auger is not bent. Straighten or replace as required.
SPOUT
Check for proper alignment of the spout and cone. Re-align as required using the load cell
and adjusting the flexure plates.
Check the flexible seals for deterioration, bulging and/or cracking. R/R as required
Remove any product build-up.
AUGER SEAL ASSEMBLY
PACKING
Check stuffing box for leakage and adjust for proper compression. Adjust when box is
leaking.
Check packing material for cleanliness. Replace as required.
AIR SEAL
Check the shaft seals for deterioration and/or cracking and proper pressure on regulator.
Pressure on mini regulator should be 2-3 PSI. Adjust air pressure flow and if still leaking
replace seal.
INLET HOPPER ASSEMBLY
BEARINGS
Check the bearing seals for deterioration and/or leaking grease. Grease or replace as
required.
Check for excessive vibration with the agitator running. Replace as required.
HOPPER SEAL ASSEMBLY
PACKING
Check for proper packing compression. If leaking, adjust compression or replace packing.
Check packing material for cleanliness. Replace as required.
BAG CLAMP ASSEMBLY
PIVOTS
Check for excessive wear. Replace as required.
PADS
Check for excessive wear. Replace as required.
Check for excessive pressure on the spout. Adjust as required.