EasyManua.ls Logo

CBE PC210-ST - User Manual

CBE PC210-ST
44 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
PC210-ST
ISTRUZIONI D’USO
USER’S MANUAL
BEDIENUNGSANLEITUNG
INSTRUCTIONS D’EMPLOI
NEW TECHNOLOGY
ELECTRONICS FOR CARAVANNING
IT
DE
EN
FR
ed. 09/2019 cod. 000550 Rev.04
Question and Answer IconNeed help?

Do you have a question about the CBE PC210-ST and is the answer not in the manual?

CBE PC210-ST Specifications

General IconGeneral
BrandCBE
ModelPC210-ST
CategoryControl Panel
LanguageEnglish

Summary

Main Parts of the Electrical System

Advice and Checks

Batteries

Read instructions for use and maintenance; acid is poisonous and corrosive. Check liquid level and connections.

Battery Charger

Install in a dry, ventilated place by specialized technicians. Disconnect from 230V power before maintenance.

Tank Probes

Avoid leaving water in tanks for long periods to prevent fouling, especially in the waste water tank.

230 V Cut-Out Box

Check 230V socket is disconnected before cover removal. Ensure correct connection tightening.

Fuses

Replace fuses after identifying the cause of damage. Respect the established amperage value.

Control Panel PC210-ST

Descriptions

Details on the function of each button on the control panel, including on/off, battery checks, and tank controls.

Main Visualizations

Explanation of the symbols and indicators displayed on the control panel screen, such as battery status and tank levels.

Functions

Overview of the panel's functionalities, including battery alarms, tank alarms, and temperature readings.

Users Setting

Instructions for adjusting settings like backlight colour, LED brightness, acoustic alarms, and voltmeter calibration.

Distribution Box DS300-ST

Protection Fuses

List of fuses and their corresponding functions, such as awning light, water pump, heating/boiler, and fridge.

Connections

Diagrams and descriptions for connecting various components like tanks, control panel, signals, users, and batteries.

Electrical System Functions

Explanation of how the system handles car battery (B1) and leisure battery (B2) recharging and D+ functions.

Installation PC210-ST

Wiring Diagram PC210-ST

Related product manuals