page 3 www.centsys.com
1. INTRODUCTION
1.1. Important Safety Information
1.2. Lightning Protection
2. SPECIFICATIONS
2.1. Physical Dimensions
2.2. Technical Specications
2.3. Allowable Gate Masses
2.4. Wind Loads
3. PRODUCT IDENTIFICATION
4. REQUIRED TOOLS AND EQUIPMENT
5. NEW SITE INSTALLATION PREPARATION
5.1. General Considerations for the Installation
5.2. Determine Gate Opening Angle
5.3. Key Terms in this Section
5.4. Side Wall Limitation - Inward Opening
5.5. Cabling Requirements
5.6. Mounting the Wall Bracket
5.7. Mounting the Gate Bracket
5.8. Cabling Requirements
5.9. Critical Installation Checklist
6. OPERATOR INSTALLATION - INWARD OPENING
6.1. New Site Installations
6.2. Key Terms in this Section
7. OPERATOR INSTALLATION - OUTWARD OPENING
7.1. New Site Installations
Page 5
Page 6
Page 8
Page 9
Page 9
Page 9
Page 11
Page 12
Page 13
Page 14
Page 15
Page 15
Page 16
Page 17
Page 17
Page 16
Page 19
Page 21
Page 22
Page 23
Page 24
Page 24
Page 24
Page 24
Page 24
Contents