EasyManua.ls Logo

Christ Alpha 2-4 LSCplus - Operation; Initial Start-up

Default Icon
131 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Freeze-dryer Alpha 1-4 LSCplus
Freeze-dryer Alpha 2-4 LSCplus
6 Operation
38 / 131
6 Operation
6.1 Initial start-up
WARNING
Before the initial start-up, please ensure that your freeze-dryer is properly
set up and installed (see chapter 5 - "Set-up and connection")
6.2 Installation of accessories
The accessories must be completed in accordance with the drying method
that is applied as well as in accordance with the scope of supply.
Please contact our sales department if you have any queries.
6.3 Preparation
The ice condenser chamber must be clean and dry.
Remove any water residues from the preceding run.
Close the media drain valve and the aeration valve.
Ensure that all of the valves of the accessories are closed.
Switch the vacuum pump on.
6.4 Switching the freeze-dryer on
Actuate the mains switch.
The control unit performs a self-test and an initialisation. This may take
several seconds.
Follow the safety instructions and hazard warnings (see chapter 3 -
"Safety")!

Table of Contents

Related product manuals