EasyManua.ls Logo

Christ Beta 1-8 LSCbasic - 6 Operation; Initial Start-Up; Installation of Accessories; Preparation

Christ Beta 1-8 LSCbasic
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Freeze-dryer Beta 1-8 LSCbasic
Freeze-dryer Beta 2-8 LSCbasic
6 Operation
Version 03/2018, Rev. 1.5 of 09/03/2020 sb-dc
43 / 107
Translation of the original operating manual
6 Operation
6.1 Initial start-up
WARNING
Before the initial start-up, please ensure that your freeze-dryer is properly
set up and installed (see chapter 5 - "Set-up and connection")
6.2 Installation of accessories
The accessories must be completed in accordance with the drying method
that is applied as well as in accordance with the scope of supply.
6.3 Preparation
The ice condenser chamber must be clean and dry.
Remove any water residues from the preceding run.
Close the aeration valve and the media drain valve.
Ensure that all of the valves of the accessories are closed.
Switch the vacuum pump on.
6.4 Switching the freeze-dryer on
Actuate the mains switch.
The control unit performs a self-test and an initialisation. This may take
several seconds.
Follow the safety instructions and hazard warnings (see chapter 3 -
"Safety")!

Table of Contents

Related product manuals