The recommended torque for securing the captive screws is 0.7
N-m.
Note
Step 7
Ensure that the terminal block plug is fully seated in the terminal block header (see the figure below) on the DC power
supply panel. See Installing the DC Power Supply for installing the power supply unit into the chassis.
Figure 69: DC Terminal Block Plug Insertion
DC power supply terminal block plug
being inserted into terminal block header.
2Lead wires secured1
Cisco ASR 903 Aggregation Services Router Hardware Installation Guide
111
Installing the Cisco ASR 903 Router
Installing the DC Power Supply

Table of Contents

Other manuals for Cisco ASR 903

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco ASR 903 and is the answer not in the manual?

Cisco ASR 903 Specifications

General IconGeneral
Form FactorModular
Storage Temperature-40°C to 70°C (-40°F to 158°F)
Humidity5% to 95% non-condensing
RedundancyYes, redundant power supplies and route processors
Operating SystemCisco IOS XE
Power SupplyAC or DC
Switching Capacity240 Gbps
Operating Temperature-40°C to 65°C (-40°F to 149°F)
MTBF200, 000 hours
Supported ProtocolsIPv4, IPv6, MPLS, L2VPN, L3VPN
InterfacesGigabit Ethernet, 10 Gigabit Ethernet, T1/E1

Related product manuals