CHAPTER
2-1
Catalyst 3550 Multilayer Switch Hardware Installation Guide
78-11358-01
2
Installing and Starting the Switch
This chapter describes how to install and start your Catalyst 3550 switch, make
connections to the switch, and how to interpret the power-on self-test (POST) that
ensures proper operation. Read the topics and perform the procedures in the order
that they are presented:
• Preparing for Installation, page 2-2
• Installing the Switch, page 2-8
• Installing the GBIC Modules, page 2-15
• Powering On the Switch and Running POST, page 2-17
• Connecting to the 10/100/1000 Ports, page 2-18
• Connecting to the GBIC Module Ports, page 2-20
• Connecting a PC or Terminal to the Console Port, page 2-22
• Where to Go Next, page 2-23