EasyManua.ls Logo

Cisco UCS X9508 - Front Install Template; Rear Install Template

Cisco UCS X9508
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Front Install Template
Use this installation to locate the correct spacing and alignment for chassis mounting hardware on the rack.
This template shows the rack locations for mounting the front of the chassis.
Align the Chassis Top of the template with the location in the rack where the top of the chassis will be and
install the cage nuts and other hardware as shown.
Figure 1: Rack Installation Template, Front
Rear Install Template
Use this installation to locate the correct spacing and alignment for chassis mounting hardware on the rack.
This template shows the rack locations for mounting the rear of the chassis.
Align the Chassis Top of the template with the location in the rack where the top of the chassis will be and
install the cage nuts and other hardware as shown.
Installation
13
Installation
Front Install Template

Other manuals for Cisco UCS X9508

Related product manuals