EasyManua.ls Logo

CITROEN C1 - Page 75

CITROEN C1
197 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
69
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine : CFA
Fit a new O-ring seal on the guide-tube of the oil level gauge.
Coat the O-ring seal with a thin layer of engine oil.
Refit the guide-tube of the oil level gauge with the screw.
Tightening torque : 1 ± 0,1 m.daN.
Refit the alternator
(see corresponding operation)
.
Position the elastic clip for the coolant pump.
Apply seal paste
(AUTOJOINT OR)
on the surround of the sump.
Refit the engine-gearbox assembly
(see corresponding operation)
.
Refit the driveshafts
(see corresponding operation)
.
Refit the sump.
Refit the auxiliary drive belt
(see corresponding operation)
.
Fill and top up the engine and the gearbox
(see corresponding operation)
.
Fill and bleed the engine cooling circuit
(see corresponding operation)
.
Check all the levels.
Reconnect the battery negative terminal.
IMPERATIVE : Perform the operations that are required following a battery reconnection
(see
corresponding operation).
B1D201ND
B1D201MD
FR-C1-page022-92-2005 9/01/06 8:49 Page 69

Table of Contents

Other manuals for CITROEN C1

Related product manuals