EasyManua.ls Logo

Clark NPR17 - Unloading

Clark NPR17
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section
5.
Operating Procedures
Putting
a
Load
in a
Rack
Depositing
a
load
in a
rack. Line
the
truck
up
parallel
with
the
rack, with
the
rack
on
your right side. Raise load
4-6
inches above
the
rack,
making
sure
you
have plenty
of
clearance above
the
load
and
around
the
truck
itself.
Turn slowly
into
the
rack. Watch
the
outriggers,
and
the
rear
of the
truck
as you
move forward,
stop
when
the
outriggers
are
within
a
couple
of
inches
of the
rack. Extend carriage, forks
and
load
into
the
rack. Tilt
forks
down
until
the
load
is
level
and
lower until
the
forks clear
the
pallet.
Retract
the
pantograph slowly. When
the
forks
are
fully retracted,
reverse
and
swing back parallel
to the
rack, lower
the
carriage
and
forks
to
travel height.
To
deposit
a
load
on the
floor
after
being moved into
the
cor-
rect
position, extend
the
panto-
graph, tilt
the
forks forward
to a
vertical
position
and
lower
the
load.
Adjust
the
fork height
and
tilt
the
forks
forward slightly,
as
neces-
sary,
for
smooth removal
of the
forks
from
the
load (pallet).
Carefully
retractthe
forks,
back
away
to
clear
the
forks from
the
load.
Raise
the
forks
to
traveling
height.
IMPORTANT
It
Is a
good
Idea
to
have
a
spot-
ter
in the
next
aisle.
The
spotter
can
watch
and
make
sure
that
you
do not
knock
other
Items
off
In the
next
aisle
or
onto
an
Innocent
bystander.
Unloading 5-13

Related product manuals