climatemaster.com
19
TSM/TSL Vertical Stack
Rev.: January 18, 2021
THE SMART SOLUTION FOR ENERGY EFFICIENCY
Style 3
Only
RA
Side
RA Side
9.25
(235)
1/4” to 1” GAP
(6 to 25mm)
Shuto
Handle
2.75
(70)
5.00
RA Side
RA
Side
Style 2
Only
Style 5
Only
Note: Cabinet Model Digit 9 Indicates Style
Style 4
Only
S R D
SS RS R D
D R S
D R S
90°
±3°
D R S
Bottom of
Cabinet
3.12 (79)
± .12 (3)
39.75 (1100)
± .50 (13)
Shuto
Valve
Supply and Return Drain
Always
Insulated
Runout
Cabinet Size Valve FPT
D1, D2 09, 12 1/2“ (13)
D3, D4 15, 18 3/4” (19)
D5, D6, D7 24, 30, 36 1” (25)
1.00 Min (25)
2.50 Max (63)
RA
Side
Model (D2)
Size (12)
Style (5)
Tag (_)
Riser Number (_)
(S) (R) (D)
(
¹
/
¹
) (
¹
/
¹
) (
¹
/
¹
)
Slot
Riser DIA
Top/Bottom
DIA Placement
Valve Size
(
(
¹
/
²
Riser and Cabinet Installation, Cont’d.
Figure 2: Riser Placement Figure 3: Riser Setting Detail
Figure 4: Riser or Extension Insertion
Figure 5: Suggested Floor Markings
(Change data for your unit)
Shutos
Inside
Step 1
Risers Opposite
Return Air Opening
Approx.
1/4” to 1”
(6 to 25)
Push Push
Push
When cabinets are pushed up to risers allow suent clearance.
Shutos should be inside cabinet.
Step 2Step 1
Risers Adjacent to
Return Air Opening
Final
Cabinet Postion
6”
(152)