Instruction Manual - Original Version
Page 22 of 50
5.4.1.2 Mounting Z-axis
The following section will explain how Z-axes
must be handled while placing and securing it
onto installed anchors.
Each of the Z-axes is marked at the bottom (Z1-
Z4) and must be placed on dedicated anchors
(see Figure 4Figure 1). After secured and resting
on anchors, Z-axes must be leveled to be
perpendicular to the ground.
Personnel installing Z axes must wear safety
helmets, steel toe shoes and gloves.
Figure 4: Placement of Z-axes
Tools needed
Figure 5: Lifting and mounting details
1 x Crane or telescope forklift
(min. 1000 kg at 12 meters)
2 x 24mm wrench
32 x Nuts for M16 thread
32x Washers for M16 bolt
1 x Leveler
1 x Laser measuring device
Procedure:
1. Insert 1 x M16 Nut and 1 x washer on each anchor threads.
2. Make sure there is enough thread to mount the axes (min 60mm open thread above nut and
washer).
3. Roughly level the nuts.
4. Strap and lift the axis as shown in Figure 5.