EasyManua.ls Logo

CommScope OneCell - Page 36

CommScope OneCell
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 Baseband Controller installation
3-8 M0303A2 4.5.01 September 2020
D
R
A
F
T
12 On the back of the Baseband Controller, turn on the power.
The LEDs on the front panel will be solid green, when the power is on. If none are on,
check your power connection. If the LED pattern is other than all green, see Baseband
Controller LED patterns on page B-2.

Table of Contents