EasyManua.ls Logo

Conair Basic 32 Loader Control B32 - Preparing for Installation

Conair Basic 32 Loader Control B32
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Carefully remove the B32 components from
their shipping containers, and set upright.
Remove all packing material, protective paper,
tape and plastic.
Carefully inspect all components to make sure
no damage occurred during shipping. Notify the shipper
immediately if damage is found.
Take a moment to record serial numbers,
the software version number and electrical power specifi-
cations in the blanks provided on the back of the the User
Guide’s title page. The information will be helpful if you
ever need service or parts.
You are now ready to begin installation.
Follow the preparation steps on the next page, paying par-
ticular attention to all wiring consideration and recom-
mendations.
The B32 central loading control comes in one box. The box
should include:
UNPACKING
THE BOXES
Basic 32 Loader Control UGC007/0702
3-2 INSTALLATION
1
2
3
4
5

Related product manuals