KIT Base Unit ED175 Installation Instructions
Publication Number: 629097525INS - 8 - © 2016, Cornelius Inc.
Figure 10.
4. Connect the 30" jumpers to the control board & route the jumpers out of electrical box through the bushing
installed in the above step (See Figure 6).
NOTE: Agitation will occur.
5. Connect one end of the jumper to the keypad to test the keypad & valve functioning. Temporarily connect
power to the unit. See Figure 11.
Figure 11.
Test flavor keypad for valve solenoid operation, check soda valves for normal operation as well.
NOTE: Disconnect power once the keypad operation has been successfully tested. Install guide clip to
th
e bottom side of electrical box to secure jumper slack. Secure any remaining harnesses
under electrical box with cable ties.
Figure 12. ED175 Solenoids
(Right Side Shown)
Figure 13.