EasyManua.ls Logo

CUES MPlus+ - Connecting the Coiler to the PCU

CUES MPlus+
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
CUES Inc., MPlus+ User Manual | CH905 
www.cuesinc.com, | salesinfo@cuesinc.com
SET-UP & INSTALLATION
CONNECTING THE COILER TO THE PCU -
STANDARD OR XL VERSION
The coiler and AC connections are located on the
side of the control unit.
Attach the interconnect cable, P/N CH, from
the coiler to the control unit as shown.
Connect the AC power cord to the control
unit as shown.
Conrm the Battery “Charging” Yellow
Light or Charged” Green Light indication
appears on control unit.