EasyManua.ls Logo

Culligan GBE - Com­M­ercial Setup

Culligan GBE
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Programming 22
21 CULLIGAN GLOBAL ELECTRONIC CONTROLLER
Typical Commercial Setup
Setting up the GBE for a commercial installation requires a few additional steps. Follow the outline below to
make sure everything is covered.
1) Run the first time setup (see pages 24 to 27)
2) Set up accessories (see pages 33) This includes:
Water Meter (remember to set K Factor)
Aqua-Sensor
Aux In
Aux Outs (needed for multi-tank, brine reclaim and refill on 4-cycle valves)
Smart Brine Tank Sensor
Wireless Remote
Modem
Service Phone
External Filter
3) You must tell the controller if it is a multi-tank system. This is under Advanced Setup/System Setup (see
pages 29). The MultiTank System setting is set to PROG FLOW for ALL multi-tank systems. Trip point
settings will determine how unit operates (progressive, parallel or alternating - page 42).
4) If you are using immediate regeneration, you must change the Reserve Capacity setting under Advanced
Setup/REGEN SETUP and the REGEN MODE. See pages 30.
5) Set/Review Cycle Times This is under Advanced Setup/Cylce Times. Especially check the Brine Draw/
Slow Rinse (BD/RINSE) and the Fast Rinse. 5-cycle valves have separate refill. See pages 31.
6) You need to do this setup procedure on each control in the system. You may want to write down
the settings you change.
7) Refer to Appendix D for a quick programming chart.
Programming

Related product manuals