EasyManuals Logo

Daikin LX10F10A User Manual

Daikin LX10F10A
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #81 background imageLoading...
Page #81 background image
3-2
3.1 Pre-Trip Inspection
Perform a pre-trip inspection of each component and take remedial actions if necessary so that the unit will
operate normally. The following is the items necessary for a pre-trip inspection, but those surrounded with a
frame can receive an automatic PTI.
(1) Appearance inspection of unit
Physical damage
Casing insulation through penetration
Drain hose (dust and clogging)
Power cable and plug damage
Condition of refrigerant piping fasteners
Condition of each sensor installation
Loose mounting sections
Bolts and nuts ----- Casing frame, compressor, fan motor, control box
Cable glands ----- Control box
Conditions of control box cover packing (water-proof)
Magnetic contactor contact point for burning out
(2) Inspection before unit operation
Refrigerant leakage inspection
Power voltage inspection (Automatic PTI range)
(3)
Operation inspection of safety
device and control equipment
HPS ……Measurement of the actuating pressure
Safety device by stopping the condenser fan motor
Control equipment Solenoid valve ……
Inspection of operation (open and close) and leakage
EFM ……Speed switchover and rotating direction
EEV, EMV, DMV ……
Inspection of operation (open and close) and leakage
(4) Operation in each mode
Pull-down 0 Pull-down time, voltage and current
Chilled control 0 Electronic temperature recorder calibration
Return, supply air temperature differential, voltage and current
Defrosting Defrosting time
Pull-down -18
Pull-down time, evaporator fan motor speed switchover
Frozen control -18 Electronic temperature recorder calibration
(Difference of temperature, direction of rotation)
Dehumidification operation and humidity sensor inspection
ON/OFF, voltage and current
Remaining frost inspection
(5) PTI report preparation
Consumables
Rechargeable battery: 2 years
Humidity sensor: Inspect every year. Replace when appropriate.
Refrigerant: Inspect at the time of PTI. Replace if an abnormality (malfunction caused by moisture entering, etc.) is detected.
Power plug: Inspect during PTI. Replace if an abnormality is detected.
Power cable: Inspect during PTI. Replace if an abnormality is detected.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin LX10F10A and is the answer not in the manual?

Daikin LX10F10A Specifications

General IconGeneral
BrandDaikin
ModelLX10F10A
CategoryRefrigerator
LanguageEnglish

Related product manuals