EasyManua.ls Logo

Daikin LXE10E-A - Page 206

Daikin LXE10E-A
238 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-23
2. Operation procedure flow chart
S
S
S
I/O ON I/O OFF
I/O
S
I/O
Unit On / Off key S key Select key
Enter key 8 / Chart key
CHART
CHART
CHART
Difference from standard model
★:
Dehumidification control is available on A26 and A26A only.
Power OFF
Unit OFF
All indication
light on
(for 3 sec.)
Starting
preparation
(for 18 sec.)
※ 1
Current
indication
(Operation state)
When no power supply
Non operation for 30 sec.
Circuit Breaker ON
Circuit Breaker OFF
after setting change
( OFF when no settig change)
※ 3
Battery mode, Operation Condition Setting with back-up battery
(Set Point Temperature˚C / Humidity %, / Defrost Interval)
for 3 sec. for 3 sec. for 3 sec. for 3 sec.
※ 10
※2 Operation Setting (Set Point Temperature˚C, Humidity %, Defrost Interval)
※6 Sensor Indication
※ 3.10.1 Chart Indication
※ 7 Temperature
Record Scroll
※ 8 Alarm
Record Scroll
※ 12※ 11 ※ 13
or non operation for 5 min.
or non operation for 5 min.
※G-SET operation
 (The energy consumption
 
reducing operation)
※4 Dehumidification
  
ON-A・OFF setting
※4 Automatic
  
pump down
F. PTI
S. PTI
M. CHECK
※14
Logging data can be down loaded even when the power supply OFF, the unit OFF
or the unit in operation.
To down load the data during the power supply OFF, press the key for using
the wake-up battery.
Optional
Function
Setting
Basic
Function
Setting
Optional
Condition
Setting
Container
I.D & Time
Setting
for 3 sec.
MODE
M
MODE
M
MODE
M
MODE
M
※ Section 3.9.2
08LXE10E-A(22-25)07.2.54:36PMページ8-23
https://daikin-p.ru

Table of Contents