IM 1267-7 • PRECISELINE AIR HANDLER 8 www.DaikinApplied.com
Figure 6: Clearance and Access Requirements for Vertical
Units
back, depending on piping orientation. These holes
should either be drilled prior to unit installation, or a
clearance of 24" should be left on the side requiring