– i –
Table of Contents
1 Introduction .........................................1
How to Use This Manual ............................1
2 Components .......................................2
DDMS Cabinet Types ................................2
Power and Control Enclosure ................2
Power Enclosure .....................................3
Control Enclosure ...................................3
336S Trafc Cabinet ................................ 3
334 Trafc Cabinet..................................3
Laptop Interface Enclosure ...................3
Cabinet Light .............................................3
DC Terminal Assembly ...............................3
DDMS Controller ........................................3
Door Sensor ................................................3
Exhaust Fan Assembly ...............................3
Fiber-to-Wire Enclosure .............................4
LED Panel ....................................................4
Module ........................................................4
Outlets .........................................................4
Power Entry Box ..........................................4
Power Supply Assembly ............................4
Power Supply ..........................................4
Isolation Board ........................................4
Surge Suppressor ........................................5
Vanguard
®
Auxiliary Control Panel (ACP)
.....................................................................5
VM CAN Distribution Board (Optional) ...5
3 Mechanical Installation .....................6
Power and Control Enclosure Mounting .6
Pole Mounting .........................................6
Wall Mounting .........................................6
Trafc Cabinet Mounting ..........................6
Ground Mounting ...................................6
Pole Mounting .........................................6
LIE Mounting ...............................................6
4 Conduit Installation ............................7
Getting Started ..........................................7
AC Power Conduit ....................................7
DC Power Conduit ....................................7
Signal Conduit ............................................7
5 Electrical Installation ..........................8
Getting Started ..........................................8
AC Power for Sets with One DDMS
Cabinet .......................................................8
Grounding ...............................................8
Power .......................................................8
LIE Termination ...........................................9
AC Power.................................................9
Signal .......................................................9
Interconnections at DC Terminal
Assembly .....................................................9
DC Power and Ground ........................... 9
Signal .......................................................9
6 Control Equipment Conguration ...10
DDMS Controller Connections ...............10
DDMS Controller Communications (J4—
J7, J11, and J12) ...................................10
Central Control Port (J6 and J7) .......... 10
Auxiliary Control Port (J5-A and J5-B,
J8-A and J8-B) ......................................10
Ethernet Port (J4) ...................................10
Control Panel (J8) .................................10
Peripheral Connections (TB1—TB5) ..... 11
ACP Connections (J2, J3, J4) .................11
Power Connection (J4) ........................11
Signal Connection (J2) ........................11
Peripheral Connections (J3) ................ 11
DDMS Controller Conguration Using the
ACP / LCD Simulator ...............................11
Installation and Setup ..........................11
Logging In .............................................12
LED Panel Conguration ......................12
Set Date and Time ................................14
Peripheral Conguration ...................... 14
Communication Conguration ...........14
Central Control Port ..............................14
Ethernet Control Port ............................15
IP Settings ..............................................15
Logging Out ..........................................15
7 Field Test Procedure .........................16
Power and Control Equipment in the
Same Cabinet ..........................................16
Power and Control Equipment in
Separate Cabinets ...............................17