EasyManua.ls Logo

Dalla Corte EVO 2 - MACHINE STARTUP AND OPERATION; Initial Machine Startup and Heating; SETTING ADJUSTMENTS; Machine Settings Adjustment

Dalla Corte EVO 2
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MANUALE INSTALLATORE RELEASE 00.1 PAG. 5
STARTING AND HEATING UP THE MACHINE
Follow all the instructions with the help of the controls diagram and description in the “USER AND
MAINTENANCE MANUAL”.
Start the machine after checking all connections.
Turn on the water tap 1-Pic.1 and make sure there are no leaking connections in flexible hoses 2-
Pic.1.
Turn on the ON/OFF electric supply switch 7-Pic.1 and turn the machine switch clockwise (see
“USER AND MAINTENANCE MANUAL”).
Check the display on front control panel turns on and shows:
MAIN SCREEN DISPLAY
The main screen (e.g. in a 3-group) disappears and the values below group and boiler icons start
blinking to show the units are heating up.
Immediately afterwards, the symbol starts blinking to indicate boiler
is filling up.
At the end of the filling phase, the symbol disappears and the values
below group and boiler icons start blinking to show the units are heating
up.
When all units reach the set temperature, the values below group and
boiler icons stop blinking.
Now the coffee machine is ready for use.
FUNCTIONING
All machine functioning instructions can be found in the “USER AND MAINTENANCE MANUAL”
attached to each machine.
ADJUSTING MACHINE SETTINGS
This coffee machine has a whole set of parameters that can be adjusted to optimize its functions,
coffee extraction and energy saving.
These adjustments must be carried out exclusively by professionals who have been specifically
trained by the manufacturer.
Machine programming can be accessed through the front control panel display and the 3
navigation buttons below the display, which can change their function according to the menu that
is displayed.

Related product manuals