TPE2/TPE5 (Power Control + Pressure Compensated Control + Electric Displacement Control)
Warning
(1) Adjustment is not permissible
D1P 130/145+TPE5
D1P 193/260+TPE2
*Control oil filter is optional
MB
E B
L3
S M4 L1 L2
Vg min
Vg max
P400074
*
Power Control (T) Principle and Operation
Please refer to TPSN (Power Control + Pressure Compensated Control + Load Sensing Control) on page 15
Pressure Compensated Control (P) Principle and Operation
Please refer to NPNN (Pressure Compensated Control) on page 9
Electric Displacement Control (E2/E5) Principle and Operation
Please refer to NNES (Electric Displacement Control + Load Sensing Control) on page 17
TPE2/TPE5 Priority
The Pressure Compensated Control (P) has priority over the Power Control (T), and the Power Control (T)
has priority over Electric Displacement Control (EDC).
Service Manual
D1 High Power Open Circuit Pumps Size 65/130/145/193/260
Operation
©
Danfoss | July 2019 L1527453 | AX00000292en-CN0201 | 21