1 How to Read these Operating Instructions
4
2 Safety
6
2.1 Safety Note
6
2.1.1 General Warning 6
2.1.2 Before Commencing Repair Work 7
2.1.3 Special Conditions 7
2.1.4 Avoid Unintended Start 7
2.1.5 Safe Torque Off (STO) 7
2.1.6 IT Mains 8
3 Mechanical Installation
9
3.1 How to Get Started
9
3.2 Pre-installation
9
3.2.1 Planning the Installation Site 9
3.2.2 Receiving the Frequency Converter 10
3.2.3 Transportation and Unpacking 10
3.2.4 Lifting 10
3.2.5 Mechanical Dimensions 12
3.2.6 Rated Power 19
3.3 Mechanical Installation
20
3.3.1 Tools Needed 20
3.3.2 General Considerations 21
3.3.3 Terminal Locations - Enclosure Type D 22
3.3.4 Terminal Locations - E Enclosures 24
3.3.5 Terminal Locations - Enclosure type F 29
3.3.6 Cooling and Airflow 33
3.3.7 Installation on the Wall - IP21 (NEMA 1) and IP54 (NEMA 12) Units 35
3.3.8 Gland/Conduit Entry - IP21 (NEMA 1) and IP54 (NEMA12) 35
3.3.9 IP21 Drip Shield Installation (Enclosure Types D1 and D2) 37
3.4 Field Installation of Options
37
3.4.1 Installation of Duct Cooling Kit in Rittal Enclosures 37
3.4.2 Installation of Top-only Duct Cooling Kit 38
3.4.3 Installation of Top and Bottom Covers for Rittal Enclosures 38
3.4.4 Installation of Top and Bottom Covers 39
3.4.5 Outside Installation/NEMA 3R Kit for Rittal Enclosures 39
3.4.6 Outside Installation/NEMA 3R Kit of Industrial Enclosures 40
3.4.7 Installation of IP00 to IP20 Kits 40
3.4.8 Installation of IP00s D3, D4, & E2 Cable Clamp Bracket 40
3.4.9 Installation on Pedestal 40
Contents VLT HVAC Drive FC 102 Operating Instructions