EasyManua.ls Logo

Dell EMC PowerStore T - Install the Top Cover on the Node

Dell EMC PowerStore T
115 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 99. Installing the M.2 boot module adaptor
Install the top cover on the node
Steps
1. Position the top cover over the node and align it with the slots in the sides at the rear of the node.
Figure 100. Aligning the top cover
2. Pull the top cover forward to secure it in place.
Figure 101. Securing the top cover
Base enclosure service procedures
73

Table of Contents

Related product manuals