EasyManua.ls Logo

Develop ineo+ 360i - Space Requirements for Operation and Maintenance

Develop ineo+ 360i
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-16 ineo+ 360i/300i/250i
Space requirements
1
1.7
1.7 Space requirements
To ensure that machine operation, consumables replenishing, part replacement, and regular maintenance
can easily be performed, adhere to the recommended space requirements detailed below.
NOTICE
Be sure to allow a clearance of 8 inches (200 mm) or more at the back of this machine for the ventilation duct.
Unit: inch (mm)Main unit + DF-632 + FS-536 SD + PC-216 + LU-302 + MK-730 + CU-102
Unit: inch (mm)Main unit + DF-714 + FS-533 + PC-216

Table of Contents

Related product manuals