EasyManua.ls Logo

DG Flugzeugbau LS4 - 11.3 Tools and facilities required

Default Icon
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Manual LS4
Issued: May 2011
Copyright DG Flugzeugbau GmbH - any copy or publishing prohibited
Manual valid with the up-to-date cover page only
11-3
11.3 Tools and facilities required
Tools
- Accurate weighing scales for the correct mixing of resin and hardener
- Containers and wood mixing sticks
- Brushes (short hair) to apply the resin
- Metal roller to press down the glass cloth and to force the air out to reduce
the formation of bubbles
- Scissors to cut the fabric
- Adhesive tape
- Plastic film for a tempering tent
- Hot air blower
- Abrasive paper - various grades
- Knife
- Saw(-blades) to cut tough plastic
- Rubber hand gloves
- Accurate thermometer up to 60°C (140° F)
Facilities
To insure proper curing, the room temperature during repair work and at
least 12 hours afterwards should be maintained at 21°C (70° F). After that
the repaired parts are to be tempered. Therefore you may construct a
tempering tent, using plastic film or Styrofoam plates.

Table of Contents

Related product manuals