VP30 Operator’s Manual Drill - 69
Finish Job
Finish Job
Disassemble Drill String
1. Shut down pedestrian vibratory plow. See
“Shut Down” on page 41.
2. Disconnect drill string from drilling
attachment.
3. Remove drill bit.
4. Disconnect sections:
• Press tab through hole in female side
of joint (1) using special tool
(p/n 351-272).
• Pull rod sections apart (2).
Remove Drilling Attachment
When not in use, install the Roto Witch
®
drilling
attachment in storage position on left side of
console.
1. Ensure engine is shut down.
2. Disconnect quick attach connectors from
drilling connections (1) and connect to
plow attachment connections (2).
3. Install dust covers on hydraulic connectors
of drilling attachment.
4. Remove drilling attachment from machine.
5. Engage mount pin (3) in console (1).
6. Secure assembly with pin (2).
11
22
t56om036h.epst56om036h.eps