EasyManua.ls Logo

DLab RE100-Pro - 3. Inspection; 3.1 Receiving Inspection; 3.2 Listing of Items; 4. Control and Display

DLab RE100-Pro
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
3. Inspection
3.1 Receiving Inspection
Unpack the equipment carefully and check for any damages
which may have arisen during transport. Please contact
manufacturer/supplier for technical support.
Note:
1. If there is any apparent damage to the system,
please do not plug it into the power line.
2. Loosen transportation lock before Power ON.
3.2 Listing of Items
The package includes the following items:
Items
Qty
Main unit
1
Heating bath
1
Power cable
1
Glassware vertical
1
User Manual
1
4. Control and Display
4.1 Control elements
Heating bath
Evaporating flask
Motor
Condenser
Receiving flask
Operation panel
Figure 1
Figure 2
USB
Power supply
Heating bath
connector

Related product manuals