EasyManua.ls Logo

DLab RE100-Pro - 5.2 Operation

DLab RE100-Pro
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Figure 14
• Connecting tubes (Figure 15).
Figure 15
5.2 Operation
• Make sure the required operating voltage and power
supply voltage match.
• Ensure the socket must be properly grounded.
• Plug in the power cable,ensure the power is on and
begin initializing.
• Press Lift-up/Lift-down key, the lift goes up/down.
Cooling water
Cooling water
Vacuum tube