EasyManua.ls Logo

DLab RE100-Pro - 5.2 Operation

DLab RE100-Pro
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Figure 14
Connecting tubes (Figure 15).
Figure 15
5.2 Operation
Make sure the required operating voltage and power
supply voltage match.
Ensure the socket must be properly grounded.
Plug in the power cableensure the power is on and
begin initializing.
Press Lift-up/Lift-down key, the lift goes up/down.
Cooling water
Cooling water
Vacuum tube

Related product manuals