EasyManua.ls Logo

Dobot CR 10 - 4.2 Installation Location

Dobot CR 10
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Dobot CR10 Hardware User Guide
Issue V1.3 (2021-07-07) User Guide Copyright © Yuejiang Technology Co., Ltd
40
Figure 4.1 Installation space requirement
Robot Installation Location
The stability of a robot depends on the installation. You can design the platform according to
the size of the hole of the base and the real environment for mounting a robot. And the installation
height of the robot should be above 0.6 meters.The platform must not only bear the robot but also
bear the dynamic force by the maximum acceleration. Note the following before mounting the robot.
Design the platform according to the robot’s workspace, and ensure that the robot moves
without interference.
Keep the platform level which is used to mount a robot.

Related product manuals