Pre-Installation Installation Training
A70622-D1
76/192
TUNNEL
Note : A guarding tunnel must be installed on the conveyor in order to prevent from any physical access to the beam
(class1 installation, refer to safety instructions).
All Guarding tunnel are delivered with an interlock switch and safety labels
Tunnel with door on the top
Tunnel with door on the side
W400 L600 H400
W400 L900 H400
W400 L600 H600
W400 L900 H600
SERVICES
Maintenance contract
Full maintenance Preventive maintenance
use & operating Advanced maintenance
Number of operator per work shift: Number of technician per work shift:
Customer training
Number of work shift: On-site training
COMMENTS
H
L
W
H
L
w