EasyManua.ls Logo

Dover Markem-Imaje LASER 7031 - Maintenance Contract Types

Dover Markem-Imaje LASER 7031
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance checklists
A70622-D1
119/192
Standard/Access/Premium Agreement
General information
Customer name: _______________ Contact name:_______________________
Town:________________________ Printer no: Cab:__________Head:_______
Contract no:___________________ Visit report no:___________________
Date:_________________________ Service engineer:_________________
Printer information
7031 Std (10.6) IP54
7031 HD S (9.3) IP65
7031 HD QS L (10.2) Air Cooler
First Measurement
Before all checking point, Service engineer has to perform a marking test and measurement of the power
outlet of the marking head with the laser power probe ENM70264 (see power measurement procedure).
The marking test will be done on the customer’s substrate and attached with the document.
Power value (indicated on the wattmeter): ….….……..W.
Checking points (1/2)
Cabinet Checking Outside 15min
Clean cabinet and touch screen 12”.
Change filters cabinet.
Check all wiring connection (photocell, encoder, cable etc…).
Check key switches or if spare keys are missing.
Cabinet Checking Inside 15min
Check all connections on industrial Interface.
Check touch screen 12”. Adjust it if it’s necessary. (see Settings SE701)
Check connections between electronic boards and cells or alarms.

Related product manuals