CALL TOLL FREE 1-800-DR-OWNER 21
OPERA TI-PACKER
e Culti to O g Po
TE: The following procedu mes th
the transport position
Lower the on the T halfw
Tiller Co trol Box.
Lift up on ulti-pack ou lift
Assembly to isengage the ook Ass
the Tiller Wheel Mount Assembly (Fi
NOTE: Holding down on the Hook Assembly Handle will help
to engage the slot when you reach that
e end s
engages with the rod of the Tiller Wheel M n
Assembly.
4. Raise the Tiller Tines to their uppermost posi
the Tiller Control Box.
5. The Culti-packer Wheels are now engaged with the soil
and the Tiller Wheels are lifted off the gro
6. The Culti-packer is now ready to use.
Operating tips
• For best results it may be necessary to pack the
soil before seeding and then pack the so
second time after seeding.
• The Culti-packer can be used to break up
and to give soils a smooth finished appearance.
• If desired, the Culti-packer can be left in
“operating” position when the Tow Veh
being reversed.
TING YOUR DR CUL
Setting th -packer peratin sition
e Culti-packer is in NO re assu
.
1. tines iller to
Hook
ssembly
Upper
Slot
ay position with
up on the Hook
the n
2. the C er as y
d H embly Slot from
gure 33).
point.
lot 3. Slide the Hook Assembly down until th
Figure 33
ou t
tion with
und.
il a
clumps
the
icle is