7.5 Test run
Following the installation, conduct proceed to a test run.
–
Thread the needle. (see chapter 6 of the Operating Instructions)
–
Insert the full threads reel. (see chapter 6 of the Operating
Instructions)
–
Switch on the machine as described under chapter 2.1 of the
Operating Instructions.
–
Switch on the function "
Beading control
" by the arrow keys.
–
Operate the machine as described under chapter 2.2.1 of the
Operating Instructions.
–
Control the applied pocket.
20