EasyManua.ls Logo

DURKOPP ADLER 806 - Test Run

DURKOPP ADLER 806
19 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.5 Test run
Following the installation, conduct proceed to a test run.
Thread the needle. (see chapter 6 of the Operating Instructions)
Insert the full threads reel. (see chapter 6 of the Operating
Instructions)
Switch on the machine as described under chapter 2.1 of the
Operating Instructions.
Switch on the function "
Beading control
" by the arrow keys.
Operate the machine as described under chapter 2.2.1 of the
Operating Instructions.
Control the applied pocket.
20

Other manuals for DURKOPP ADLER 806

Related product manuals