OPERATING MANUAL
2010-MainTitle.doc
Equipment Serial Number:
Dynalog Job/Contract Number:
OPERATING INSTRUCTIONS
Part 1 - OPERATION
Introduction
This folder includes full instructions and data for unpacking, setting-up, commissioning, and
operating the above referenced C-Scan Model 2010 Survey & Monitoring System for buried
pipelines. Part 1 of the Manual OPERATION is divided into Sections as shown on the
Contents List on the next page. Part 2 is the Survey procedure manual supplied as a separate
document.
Before any setting-up and survey work is undertaken, these instructions must be read and fully
understood by the Operators who will carry out the survey work using this equipment.
United Kingdom Health & Safety at Work Act 1974
Section 6 (a) of this Act requires manufacturers to advise their customers
on the safety and handling precautions to be observed when installing, operating,
maintaining and servicing their products.
The user’s attention is therefore drawn to the following:
1. The appropriate sections of this manual must be read carefully before using the equipment.
2. Operation and maintenance must only be carried out by suitably trained personnel.
3. Normal safety precautions must be taken and appropriate procedures observed to avoid accidents
Refer to the equipment suppliers name and address below for any technical advice or
product information
Issue 2 - 0703
Dynalog Electronics Limited
PO Box 1073 Bristol BS99 1HF United Kingdom
e-mail: enquiry@dynalog.co.uk
Website: www.dynalog.co.uk

Related product manuals