EasyManua.ls Logo

Eaton 9140 - Page 24

Eaton 9140
365 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Eaton
®
9140 (9910-E82/E83) UPS Installation Guide for IBM
®
Applications S 164201715 Rev 2
www.eaton.com/ibm
8
3. Using two M5 machine screws and an adapter plate, attach the rail
to the front of the rack (see Figure 1 and Figure 2).
Do not tighten the screws.
Front M5 Screws
Position 5
Position 4
Position 6
Position 1
Adapter Plate
Figure 2. Securing the Front Rail
4. Adjust the rail size on the rail assembly for the depth of your rack
(see Figure 3).
Rear
Front
Figure 3. Adjusting the Rail Depth (Right Rail Assembly Shown)

Table of Contents

Other manuals for Eaton 9140

Related product manuals