EasyManua.ls Logo

Eaton 9140 - Page 27

Eaton 9140
365 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Eaton
®
9140 (9910-E82/E83) UPS Installation Guide for IBM
®
Applications S 164201715 Rev 2
www.eaton.com/ibm
11
14. Secure the front of the cabinet to the rack as shown in Figure 7.
Position 2 (M5 screw)
Position 8 (M6 screw
and clip/cage nut)
Position 3 (M5 screw)
Figure 7. Securing the Front of the EBM
NOTE To install the optional seismic mounting brackets, the length of the rails must be
between 72 and 81 cm (28.5 and 32 inches).
15. If installing the optional seismic mounting brackets, align the two
EBM seismic mounting brackets with the screw holes on the sides
of the EBM above the rear mounting brackets. Loosely secure the
brackets with four supplied wing bolts. See Figure 8.
Do not tighten the wing bolts.
Figure 8. Installing the Optional EBM Seismic Mounting Brackets

Table of Contents

Other manuals for Eaton 9140

Related product manuals