EasyManua.ls Logo

Eaton Powerware 9170+ - Page 68

Eaton Powerware 9170+
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BATTERY CABINET INSTALLATION
EATON Powerware
®
9170
+
UPS (3–18 kVA) User’s Guide S 164201393 Rev C www.powerware.com
62
Entrance Panel
Battery Cable
Figure 43. UPS Power Entrance Panel
3. Use a pair of pliers to bend the narrow links (1 and 2 in Figure 44)
between the outer edge of the lower breakaway panel and the rear
panel.
4. Use the pliers to bend the entire breakaway panel (at 3 and 4 in
Figure 44) until it breaks away.
1
2
3
4
Figure 44. Breakaway Panel Links
5. Verify all hazardous voltages have been removed from the
backplane by testing with a voltmeter or other test device.

Table of Contents

Related product manuals