XS series operating manual
XS user manual v0.55 - 96 -
Information on cycle timing
Minimum cycle timing in dielectric strength test ( hipot test)
Measurement conditions :
Software revision
Measurement display
NO (second page of the setup menu)
Interface
PLC
Rise time
0
Fall time
0
Hold time
1
Time
AUTO
Other parameters
independent
Test time = time between change of the MES_DCH (start test) signal and change of EOT (end of
test) signal = 980 mS
Measurement parameters : same as above but with hold time = 0
Test time = 700 mS. In this case there is no output voltage control.
Measurement parameters : memory number change between each measurement
Test time = basic minimum test time + 1.3 S
Minimum cycle timing in MEGOHMMETER
Measurement conditions :
Software revision
Measurement display
NO (second page of the setup menu)
Interface
PLC
Measurement time
0
Other parameters
independent
Test time = time between change of the MES_DCH (start test) signal and change of EOT (end of
test) signal = 1.58 S
Measurement parameters : memory number change between each measurement
Test time = basic minimum test time + 1.3 S
Minimum cycle timing in GROUND CONTINUITY
Measurement conditions :
Software revision
Measurement display
NO (second page of the setup menu)
Interface
PLC
Rise time
0
Fall time
0
Hold time
1
Time
AUTO
Test time = time between change of the MES_DCH (start test) signal and change of EOT (end of test)
signal = 1.19 S
Measurement parameters : memory number change between each measurement
Test time = basic minimum test time + 1.3 S