START-S1XL
Operating Guide
-12-
5.1 Working time program
The control unit has a standard working time of 60 seconds and 20 seconds of pause.
Thisoperationshouldbedoneincaseyouwanttoprogramdifferenttypeofworkingtime.
To program the different working time make the 6 steps as follow:
1 Give tension to the control unit and wait until LED L1startsashing
2 Give an OPEN or STEP-by-STEP command with the remote control or with the button
3 Press immediately BUTTON 1inthecontrolunit,LED L1 makeashshortly.
4 Press BUTTON P1 in the control unit when the gate is at the end
5 Wait the PAUSE TIME and press P1 in the control unit and press BUTTON P1 in the control unit.
6 Waituntilthegateisclosed.Endoftheoperation.
In point no.4 we suggest you to wait for a while before pressing the button after the opening limit
switch is working. This is to avoid a partial opening in case the gates needs more time to get
opened.
11 12 14
close
open
2nd channel of the remote control1 st channel of the remote control
OPEN CHIUDE
11 12 14
1 st channel of the remote control
ALT
(nc)
START step by step
alt
start
Button
up / down
Button
step by step
4 Scheme and Symbol
5 Programming