EasyManua.ls Logo

Ecolab Aquanomic - Page 27

Ecolab Aquanomic
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 27
3. Slide Reed Switch into bleach product housing, shown in image below.
Note: If the Reed Switch wires are not long enough it may be necessary to cut the cable-tie that is
restraining the wires inside the Pump Cabinet.
4. Place Bleach Product Housing into Aquanomic Sump and secure with (2) screws.
Push Reed Switch
all the way in.

Other manuals for Ecolab Aquanomic

Related product manuals