6. Instrument switch on
Once the control module has been switched on (key <I/0>), the main
menu is displayed.
8 sub-menus with the following functions are displayed (non-visible
sub-menus can be called up scrolling the arrow keys):
Always position the probe in the exhaust pipe once
the calibration phase is over!
Always us
e a filtering system as per our
recommendation for combustion plants
firing solid combustibles!
Gas analysis
Mean value
Pressure
Soot..Oil trace
Data processing
Adjustments
Control
Diagnostics
Bar indication
radio quality
Bar indication
transfer quality
accu voltage
(charging status)
Display co
n-
trast adjust-
able with
F1 and F2
At temperatures below 10 °C the gas channel plate will
be heated with mains power connection – connect
instrument to mains power!

Other manuals for Ecom j2kn pro

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ecom j2kn pro and is the answer not in the manual?

Ecom j2kn pro Specifications

General IconGeneral
BrandEcom
Modelj2kn pro
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals