ecom-J2KN
pro
Page 11
6. Instrument switch on
Once the control module has been switched on (key <I/0>), the main
menu is displayed.
8 sub-menus with the following functions are displayed (non-visible
sub-menus can be called up scrolling the arrow keys):
Always position the probe in the exhaust pipe once
the calibration phase is over!
e a filtering system as per our
recommendation for combustion plants
firing solid combustibles!
Mean value
Pressure
Soot..Oil trace
Data processing
Adjustments
Control
Diagnostics
trast adjust-
able with
F1 and F2
At temperatures below 10 °C the gas channel plate will
be heated with mains power connection – connect
instrument to mains power!